IAC Assessment: UF0605
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0605
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2023
Principal Product Asphalt Cement
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $50,000,000-$100,000,000
# of Employees 9
Plant Area (Sq.Ft.) 813,544
Annual Production 90,000 Tons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,613 1,153,600 kWh $0.09
Electricity Demand $62,661 4,466 kW-months/year $14.03
Electricity Fees $35,421 - $ -
Natural Gas $86,953 15,370 MMBtu $5.66
TOTAL ENERGY COSTS $286,648
RECOMMENDED SAVINGS* $1,613,601 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$108,422
Cost:
$322,608
$54,543 619,806 $53,879 3,840 - - - - $54,543
619,806
kWh
$53,879
3,840
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$38,052
Cost:
$10,000
- - - - $38,052 6,727 - - -
-
kWh
-
-
kW-months/year
$38,052
6,727
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,825
Cost:
$11,200
$8,213 93,331 $5,612 400 - - - - $8,213
93,331
kWh
$5,612
400
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$3,043
Cost:
$2,800
- - - - $3,043 538 - - -
-
kWh
-
-
kW-months/year
$3,043
538
MMBtu
-
-
$
05: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$1,444,605
Cost:
-
- - - - - - $1,444,605 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,444,605
-
$
06: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$5,654
Cost:
$20,000
$3,046 34,608 - - $2,608 461 - - $3,046
34,608
kWh
-
-
kW-months/year
$2,608
461
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,613,601
Cost:
$366,608
$65,802 747,745 $59,491 4,240 $43,703 7,726 $1,444,605 - $65,802
747,745
kWh
$59,491
4,240
kW-months/year
$43,703
7,726
MMBtu
$1,444,605
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes