IAC logo
IAC Assessment: UF0606
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0606
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2023
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 24
Plant Area (Sq.Ft.) 8,000,000
Annual Production 16,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,144,605 27,149,953 kWh $0.08
Electricity Demand $548,965 151,386 kW-months/year $3.63
Electricity Fees $139,643 - $ -
TOTAL ENERGY COSTS $2,833,213
RECOMMENDED SAVINGS* $547,883 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$188,564
Cost:
$146,067
$150,139 1,900,496 $38,425 10,597 - - - - $150,139
1,900,496
kWh
$38,425
10,597
kW-months/year
-
-
$
-
-
$
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$65,322
Cost:
$322,608
$51,398 650,603 $13,924 3,840 - - - - $51,398
650,603
kWh
$13,924
3,840
kW-months/year
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$38,799
Cost:
$79,800
$33,017 417,939 $5,782 1,595 - - - - $33,017
417,939
kWh
$5,782
1,595
kW-months/year
-
-
$
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$35,430
Cost:
$25,350
$35,430 448,486 - - - - - - $35,430
448,486
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,283
Cost:
-
$4,293 54,340 - - $416 - $574 - $4,293
54,340
kWh
-
-
kW-months/year
$416
-
$
$574
-
$
06: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$214,485
Cost:
$60,000
$214,485 2,714,995 - - - - - - $214,485
2,714,995
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$547,883
Cost:
$633,825
$488,762 6,186,859 $58,131 16,032 $416 - $574 - $488,762
6,186,859
kWh
$58,131
16,032
kW-months/year
$416
-
$
$574
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes