IAC logo
IAC Assessment: UF0607
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0607
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2023
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 3,000,000
Annual Production 2,737,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,832,935 22,098,600 kWh $0.08
Electricity Demand $641,506 60,178 kW-months/year $10.66
Electricity Fees $66,587 - $ -
TOTAL ENERGY COSTS $2,541,028
RECOMMENDED SAVINGS* $613,766 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$173,293
Cost:
$118,890
$128,393 1,546,902 $44,900 4,212 - - - - $128,393
1,546,902
kWh
$44,900
4,212
kW-months/year
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$122,669
Cost:
$11,700
$75,744 912,584 $46,925 4,402 - - - - $75,744
912,584
kWh
$46,925
4,402
kW-months/year
-
-
$
-
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$94,496
Cost:
$322,608
$53,562 645,324 $40,934 3,840 - - - - $53,562
645,324
kWh
$40,934
3,840
kW-months/year
-
-
$
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$36,207
Cost:
$25,350
$36,207 436,228 - - - - - - $36,207
436,228
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,683
Cost:
-
$3,609 43,485 - - $38 - $36 - $3,609
43,485
kWh
-
-
kW-months/year
$38
-
$
$36
-
$
06: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$183,418
Cost:
$60,000
$183,418 2,209,860 - - - - - - $183,418
2,209,860
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$613,766
Cost:
$538,548
$480,933 5,794,383 $132,759 12,454 $38 - $36 - $480,933
5,794,383
kWh
$132,759
12,454
kW-months/year
$38
-
$
$36
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost