IAC logo
IAC Assessment: UF0608
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0608
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2023
Principal Product Classic Model Cars
NAICS 336111 - Automobile Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 51,000
Annual Production 60 Units
Production Hrs. Annual 3,952
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,981 675,827 kWh $0.09
Electricity Demand $29,891 2,408 kW-months/year $12.41
Electricity Fees $8,512 - $ -
TOTAL ENERGY COSTS $100,384
RECOMMENDED SAVINGS* $122,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$100,291
Cost:
$322,608
$55,604 604,390 $44,687 3,600 $55,604
604,390
kWh
$44,687
3,600
kW-months/year
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$6,445
Cost:
$25,640
$4,352 47,308 $2,093 169 $4,352
47,308
kWh
$2,093
169
kW-months/year
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,437
Cost:
$3,636
$4,352 47,307 $2,085 168 $4,352
47,307
kWh
$2,085
168
kW-months/year
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$3,417
Cost:
$9,340
$3,417 37,149 - - $3,417
37,149
kWh
-
-
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,526
Cost:
$10,560
$1,625 17,666 $901 73 $1,625
17,666
kWh
$901
73
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,789
Cost:
$7,200
$1,789 19,442 - - $1,789
19,442
kWh
-
-
kW-months/year
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,138
Cost:
$5,400
$1,138 12,372 - - $1,138
12,372
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$122,043
Cost:
$384,384
$72,277 785,634 $49,766 4,009 $72,277
785,634
kWh
$49,766
4,009
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand