IAC logo
IAC Assessment: UF0625
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0625
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2024
Principal Product Sheet Metal Products
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 47
Plant Area (Sq.Ft.) 60,000
Annual Production 67,439 Units
Production Hrs. Annual 5,226
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,399 1,078,320 kWh $0.06
Electricity Demand $44,791 3,475 kW-months/year $12.89
Electricity Fees $3,736 - $ -
TOTAL ENERGY COSTS $116,926
RECOMMENDED SAVINGS* $208,898 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$51,273
Cost:
$322,608
$38,900 617,460 $12,373 960 - - - - $38,900
617,460
kWh
$12,373
960
kW-months/year
-
-
$
-
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$33,462
Cost:
$12,390
$(-575) (-9,128) $(-543) (-42) - - $34,580 - $(-575)
(-9,128)
kWh
$(-543)
(-42)
kW-months/year
-
-
$
$34,580
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$7,895
Cost:
$5,801
$4,755 75,482 $3,140 244 - - - - $4,755
75,482
kWh
$3,140
244
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,440
Cost:
$6,188
$1,355 21,505 $1,085 84 - - - - $1,355
21,505
kWh
$1,085
84
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,082
Cost:
$469
$2,082 33,047 - - - - - - $2,082
33,047
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,573
Cost:
$3,962
$1,573 24,973 - - - - - - $1,573
24,973
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$710
Cost:
-
$613 9,724 - - $43 - $54 - $613
9,724
kWh
-
-
kW-months/year
$43
-
$
$54
-
$
08: 4.463 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS Savings:
$68,287
Cost:
$300,000
- - - - - - $68,287 - -
-
kWh
-
-
kW-months/year
-
-
$
$68,287
-
$
09: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$31,920
Cost:
$804
- - - - - - $31,920 - -
-
kWh
-
-
kW-months/year
-
-
$
$31,920
-
$
10: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$9,256
Cost:
$2,512
$(-575) (-9,126) $(-543) (-42) - - $10,374 - $(-575)
(-9,126)
kWh
$(-543)
(-42)
kW-months/year
-
-
$
$10,374
-
$
TOTAL RECOMMENDED Savings:
$208,898
Cost:
$654,734
$48,128 763,937 $15,512 1,204 $43 - $145,215 - $48,128
763,937
kWh
$15,512
1,204
kW-months/year
$43
-
$
$145,215
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes