IAC logo
IAC Assessment: UF0633
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0633
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2025
Principal Product Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $50,000,000-$100,000,000
# of Employees 90
Plant Area (Sq.Ft.) 1,084,644
Annual Production 250,000 Tons
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,918 572,400 kWh $0.06
Electricity Demand $29,520 3,225 kW-months/year $9.15
Electricity Fees $11,070 - $ -
Natural Gas $178,222 68,580 MMBtu $2.60
TOTAL ENERGY COSTS $252,730
RECOMMENDED SAVINGS* $76,312 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$42,561
Cost:
$322,608
$33,772 572,400 $8,789 960 - - $33,772
572,400
kWh
$8,789
960
kW-months/year
-
-
MMBtu
02: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$8,823
Cost:
$24,000
- - - - $8,823 3,395 -
-
kWh
-
-
kW-months/year
$8,823
3,395
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,339
Cost:
$26,170
$5,339 90,496 - - - - $5,339
90,496
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,430
Cost:
$3,080
$2,364 40,068 $2,066 226 - - $2,364
40,068
kWh
$2,066
226
kW-months/year
-
-
MMBtu
05: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$3,565
Cost:
$8,000
- - - - $3,565 1,372 -
-
kWh
-
-
kW-months/year
$3,565
1,372
MMBtu
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$3,565
Cost:
$2,000
- - - - $3,565 1,372 -
-
kWh
-
-
kW-months/year
$3,565
1,372
MMBtu
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,970
Cost:
$8,200
$1,970 33,393 - - - - $1,970
33,393
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$684
Cost:
$2,120
$684 11,592 - - - - $684
11,592
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$630
Cost:
$2,500
$630 10,683 - - - - $630
10,683
kWh
-
-
kW-months/year
-
-
MMBtu
10: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$4,240
Cost:
$15,000
$675 11,448 - - $3,565 1,372 $675
11,448
kWh
-
-
kW-months/year
$3,565
1,372
MMBtu
11: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$505
Cost:
-
$139 2,352 - - $366 141 $139
2,352
kWh
-
-
kW-months/year
$366
141
MMBtu
TOTAL RECOMMENDED Savings:
$76,312
Cost:
$413,678
$45,573 772,432 $10,855 1,186 $19,884 7,650 $45,573
772,432
kWh
$10,855
1,186
kW-months/year
$19,884
7,650
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas