IAC logo
IAC Assessment: UF0634
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0634
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2025
Principal Product Custom Parts Fabrication
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 17
Plant Area (Sq.Ft.) 16,858
Annual Production 72,607 Units
Production Hrs. Annual 2,210
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,584 311,680 kWh $0.06
Electricity Demand $9,463 1,047 kW-months/year $9.04
Electricity Fees $3,244 - $ -
Other Gas $31,521 319 MMBtu $98.81
Other Energy $42,839 2,702 MMBtu $15.86
TOTAL ENERGY COSTS $106,651
RECOMMENDED SAVINGS* $108,246 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Energy Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Energy Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$45,476
Cost:
$12,413
$(-575) (-9,126) $(-381) (-42) - - $46,432 - - - $(-575)
(-9,126)
kWh
$(-381)
(-42)
kW-months/year
-
-
MMBtu
$46,432
-
$
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$19,463
Cost:
$60,000
$(-13,140) (-208,571) $(-10,236) (-1,133) $42,839 2,702 - - - - $(-13,140)
(-208,571)
kWh
$(-10,236)
(-1,133)
kW-months/year
$42,839
2,702
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,705
Cost:
$4,689
$6,006 95,333 $2,699 299 - - - - - - $6,006
95,333
kWh
$2,699
299
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$9,396
Cost:
$25,300
$2,161 34,296 $2,235 247 - - - - $5,000 - $2,161
34,296
kWh
$2,235
247
kW-months/year
-
-
MMBtu
-
-
$
$5,000
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,037
Cost:
$1,677
$1,375 21,818 $662 73 - - - - - - $1,375
21,818
kWh
$662
73
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$583
Cost:
-
$583 9,253 - - - - - - - - $583
9,253
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$326
Cost:
$1,500
$326 5,182 - - - - - - - - $326
5,182
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$22,260
Cost:
$2,620
$(-575) (-9,126) $(-381) (-42) - - $23,216 - - - $(-575)
(-9,126)
kWh
$(-381)
(-42)
kW-months/year
-
-
MMBtu
$23,216
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$108,246
Cost:
$108,199
$(-3,839) (-60,941) $(-5,402) (-598) $42,839 2,702 $69,648 - $5,000 - $(-3,839)
(-60,941)
kWh
$(-5,402)
(-598)
kW-months/year
$42,839
2,702
MMBtu
$69,648
-
$
$5,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Other Energy Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Energy Personnel Changes Administrative Changes