IAC logo
IAC Assessment: UK1311
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK1311
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2013
Principal Product Ceramic Body Armor Tiles
NAICS 327999 - All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3299 - Nonmetallic Mineral Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 115,000
Annual Production 450,000 Pieces
Production Hrs. Annual 7,728
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $993,013 28,116,425 kWh $0.04
Electricity Demand $473,275 68,317 kW-months/year $6.93
Electricity Fees $221,153 - $ -
Natural Gas $358,789 75,751 MMBtu $4.74
TOTAL ENERGY COSTS $2,046,230
RECOMMENDED SAVINGS* $51,024 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,264
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$16,665
Cost:
$200
$16,665 472,104 - - $16,665
472,104
kWh
-
-
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,284
Cost:
$88,771
$14,492 411,720 $2,792 403 $14,492
411,720
kWh
$2,792
403
kW-months/year
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,500
Cost:
$5,600
$7,500 212,000 - - $7,500
212,000
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,278
Cost:
$27,331
$3,370 95,450 $908 131 $3,370
95,450
kWh
$908
131
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,537
Cost:
$1,340
$2,537 71,870 - - $2,537
71,870
kWh
-
-
kW-months/year
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,760
Cost:
$3,342
$2,760 78,210 - - $2,760
78,210
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$51,024
Cost:
$126,584
$47,324 1,341,354 $3,700 534 $47,324
1,341,354
kWh
$3,700
534
kW-months/year
TOTAL IMPLEMENTED Savings:
$48,264
Cost:
$123,242
$44,564 1,263,144 $3,700 534 $44,564
1,263,144
kWh
$3,700
534
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand