IAC Assessment: UK1403
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK1403
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2014
Principal Product Steel Pipe
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $100,000,000-$500,000,000
# of Employees 268
Plant Area (Sq.Ft.) 529,000
Annual Production 300,000 Tons
Production Hrs. Annual 8,736
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,446,054 28,967,439 kWh $0.05
Electricity Demand $518,475 77,583 kW-months/year $6.68
Electricity Fees $250,640 - $ -
Natural Gas $148,241 19,668 MMBtu $7.54
TOTAL ENERGY COSTS $2,363,410
RECOMMENDED SAVINGS* $1,039,606 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $321,178
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Water Consumption One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Water Consumption One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $ $ Tgal $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$56,910
Cost:
$52,500
- - - - $56,910 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$56,910
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,517
Cost:
-
$2,517 45,759 - - - - - - - - - - - - - - $2,517
45,759
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,250
Cost:
-
- - - - - - - - $4,250 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$4,250
-
$
-
-
Tgal
-
-
$
-
-
$
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$26,100
Cost:
-
- - - - - - - - - - $26,100 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$26,100
-
Tgal
-
-
$
-
-
$
05: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$69,620
Cost:
$7,000
- - - - - - - - - - $69,620 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$69,620
-
Tgal
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,405
Cost:
-
$3,710 67,452 $695 92 - - - - - - - - - - - - $3,710
67,452
kWh
$695
92
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$132,390
Cost:
$479,700
$89,643 1,629,876 $16,431 2,185 - - $26,316 - - - - - - - - - $89,643
1,629,876
kWh
$16,431
2,185
kW-months/year
-
-
$
$26,316
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
08: 3.4151 MINIMIZE WATER USAGE Savings:
$68,700
Cost:
$5,200
- - - - - - - - - - $68,700 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$68,700
-
Tgal
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$50,851
Cost:
$9,648
$50,851 924,567 - - - - - - - - - - - - - - $50,851
924,567
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
10: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$250,000
Cost:
$100,000
- - - - - - - - - - - - - - $250,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
$250,000
-
$
11: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$14,129
Cost:
$40,000
$11,903 216,411 $2,226 296 - - - - - - - - - - - - $11,903
216,411
kWh
$2,226
296
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
12: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,867
Cost:
$947
$3,867 70,303 - - - - - - - - - - - - - - $3,867
70,303
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
13: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,017
Cost:
-
$3,017 54,855 - - - - - - - - - - - - - - $3,017
54,855
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
-
-
$
14: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$318,750
Cost:
-
- - - - - - - - - - - - $318,750 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
$318,750
-
$
-
-
$
15: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$34,100
Cost:
$5,000
- - - - - - - - - - $34,100 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$34,100
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,039,606
Cost:
$699,995
$165,508 3,009,223 $19,352 2,573 $56,910 - $26,316 - $4,250 - $198,520 - $318,750 - $250,000 - $165,508
3,009,223
kWh
$19,352
2,573
kW-months/year
$56,910
-
$
$26,316
-
$
$4,250
-
$
$198,520
-
Tgal
$318,750
-
$
$250,000
-
$
TOTAL IMPLEMENTED Savings:
$321,178
Cost:
$502,295
$144,361 2,624,746 $16,431 2,185 - - $26,316 - $4,250 - $129,820 - - - - - $144,361
2,624,746
kWh
$16,431
2,185
kW-months/year
-
-
$
$26,316
-
$
$4,250
-
$
$129,820
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ Tgal $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Water Consumption One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Water Consumption One-time Revenue or Avoided Cost Primary Product