IAC Assessment: UK1604
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2016
Principal Product Abrasive cut-off wheels
NAICS 327910 - Abrasive Product Manufacturing
SIC 3291 - Abrasive Products
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 130,000
Annual Production 600,000 Pieces
Production Hrs. Annual 4,160
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,089 3,375,360 kWh $0.04
Electricity Demand $133,972 7,737 kW-months/year $17.32
Electricity Fees $30,889 - $ -
Natural Gas $63,819 10,010 MMBtu $6.38
TOTAL ENERGY COSTS $349,769
RECOMMENDED SAVINGS* $62,340 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,375
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,750
Cost:
$8,715
- - - - $14,750 - - - - - -
-
kWh
-
-
kW-months/year
$14,750
-
$
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,425
Cost:
$67,500
$12,299 342,601 $17,126 989 - - - - - - $12,299
342,601
kWh
$17,126
989
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$166
Cost:
$196
$70 1,962 $46 3 - - - - $50 - $70
1,962
kWh
$46
3
kW-months/year
-
-
$
-
-
MMBtu
$50
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$153
Cost:
$280
$153 4,253 - - - - - - - - $153
4,253
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,018
Cost:
$3,500
- - - - - - $7,018 1,100 - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,018
1,100
MMBtu
-
-
$
06: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$2,304
Cost:
$3,620
$(-118) (-3,287) $(-78) (-5) - - - - $2,500 - $(-118)
(-3,287)
kWh
$(-78)
(-5)
kW-months/year
-
-
$
-
-
MMBtu
$2,500
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,094
Cost:
$5,000
$(-60) (-1,660) $(-90) (-5) - - $1,244 195 - - $(-60)
(-1,660)
kWh
$(-90)
(-5)
kW-months/year
-
-
$
$1,244
195
MMBtu
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$56
Cost:
$61
- - - - - - $56 9 - - -
-
kWh
-
-
kW-months/year
-
-
$
$56
9
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,645
Cost:
$1,200
$4,645 129,376 - - - - - - - - $4,645
129,376
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,729
Cost:
$6,000
- - - - - - $2,729 428 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,729
428
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$62,340
Cost:
$96,072
$16,989 473,245 $17,004 982 $14,750 - $11,047 1,732 $2,550 - $16,989
473,245
kWh
$17,004
982
kW-months/year
$14,750
-
$
$11,047
1,732
MMBtu
$2,550
-
$
TOTAL IMPLEMENTED Savings:
$25,375
Cost:
$21,176
$(-25) (-694) $(-168) (-10) $14,750 - $8,318 1,304 $2,500 - $(-25)
(-694)
kWh
$(-168)
(-10)
kW-months/year
$14,750
-
$
$8,318
1,304
MMBtu
$2,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes