IAC logo
IAC Assessment: UK1606
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK1606
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2016
Principal Product Waste Water Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 5
Plant Area (Sq.Ft.) 87,120
Annual Production 365,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,249 1,009,750 kWh $0.07
Electricity Demand $22,973 2,367 kW-months/year $9.71
Electricity Fees $634 - $ -
TOTAL ENERGY COSTS $91,856
RECOMMENDED SAVINGS* $38,652 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$19,749
Cost:
$90,000
$10,659 157,680 $2,808 216 $6,282 255,661 - - $10,659
157,680
kWh
$2,808
216
kW-months/year
$6,282
255,661
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,258
Cost:
$7,310
$2,868 42,423 $390 30 - - - - $2,868
42,423
kWh
$390
30
kW-months/year
-
-
lb
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,300
Cost:
$8,440
$9,300 138,000 - - - - - - $9,300
138,000
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$316
Cost:
-
$316 4,672 - - - - - - $316
4,672
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,013
Cost:
-
$4,104 60,704 - - - - $909 - $4,104
60,704
kWh
-
-
kW-months/year
-
-
lb
$909
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,016
Cost:
$2,500
$610 9,017 $406 31 - - - - $610
9,017
kWh
$406
31
kW-months/year
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$38,652
Cost:
$108,250
$27,857 412,496 $3,604 277 $6,282 255,661 $909 - $27,857
412,496
kWh
$3,604
277
kW-months/year
$6,282
255,661
lb
$909
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes