Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2016
Principal Product waste water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 8
Plant Area (Sq.Ft.) 700,000
Annual Production 1,606,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,571 3,023,200 kWh $0.03
Electricity Demand $102,589 5,487 kW-months/year $18.70
Electricity Fees $2,379 - $ -
TOTAL ENERGY COSTS $209,539
RECOMMENDED SAVINGS* $143,061 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,087
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$125,405
Cost:
$660,000
$40,009 1,156,320 $29,620 1,584 $55,776 17,208 - - - - $40,009
1,156,320
kWh
$29,620
1,584
kW-months/year
$55,776
17,208
lb
-
-
$
-
-
$
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$15,087
Cost:
$75,544
$758 21,900 $561 30 - - $1,768 - $12,000 - $758
21,900
kWh
$561
30
kW-months/year
-
-
lb
$1,768
-
$
$12,000
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,569
Cost:
$9,415
$841 24,295 $1,728 92 - - - - - - $841
24,295
kWh
$1,728
92
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$143,061
Cost:
$744,959
$41,608 1,202,515 $31,909 1,706 $55,776 17,208 $1,768 - $12,000 - $41,608
1,202,515
kWh
$31,909
1,706
kW-months/year
$55,776
17,208
lb
$1,768
-
$
$12,000
-
$
TOTAL IMPLEMENTED Savings:
$15,087
Cost:
$75,544
$758 21,900 $561 30 - - $1,768 - $12,000 - $758
21,900
kWh
$561
30
kW-months/year
-
-
lb
$1,768
-
$
$12,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes Ancillary Material Cost