IAC Assessment: UK1708
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK1708
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2017
Principal Product Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 5
Plant Area (Sq.Ft.) 65,000
Annual Production 596,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,139 1,851,480 kWh $0.06
Electricity Demand $35,629 3,733 kW-months/year $9.54
Electricity Fees $4,217 - $ -
TOTAL ENERGY COSTS $148,985
RECOMMENDED SAVINGS* $94,170 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $217
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$46,813
Cost:
$31,719
$41,089 696,420 $5,724 600 - - - - $41,089
696,420
kWh
$5,724
600
kW-months/year
-
-
$
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$5,465
Cost:
$26,520
$3,198 54,203 $2,267 238 - - - - $3,198
54,203
kWh
$2,267
238
kW-months/year
-
-
$
-
-
$
03: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$2,904
Cost:
-
$2,904 49,220 - - - - - - $2,904
49,220
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$14,895
Cost:
-
$6,822 115,632 $754 79 $7,319 - - - $6,822
115,632
kWh
$754
79
kW-months/year
$7,319
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$986
Cost:
$1,253
$862 14,606 $124 13 - - - - $862
14,606
kWh
$124
13
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$461
Cost:
$762
$289 4,894 $172 18 - - - - $289
4,894
kWh
$172
18
kW-months/year
-
-
$
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$217
Cost:
-
$217 3,686 - - - - - - $217
3,686
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$333
Cost:
-
- - - - - - $333 - -
-
kWh
-
-
kW-months/year
-
-
$
$333
-
$
09: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$22,096
Cost:
$78,750
$18,089 306,600 $4,007 420 - - - - $18,089
306,600
kWh
$4,007
420
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$94,170
Cost:
$139,004
$73,470 1,245,261 $13,048 1,368 $7,319 - $333 - $73,470
1,245,261
kWh
$13,048
1,368
kW-months/year
$7,319
-
$
$333
-
$
TOTAL IMPLEMENTED Savings:
$217
Cost:
-
$217 3,686 - - - - - - $217
3,686
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost