IAC Assessment: UK1806
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2018
Principal Product Steel Service Center
NAICS 332313 - Plate Work Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 200,000
Annual Production 75,000 Units
Production Hrs. Annual 5,700
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,295 1,674,000 kWh $0.03
Electricity Demand $112,610 6,499 kW-months/year $17.33
Electricity Fees $17,059 - $ -
Natural Gas $42,065 3,908 MMBtu $10.76
TOTAL ENERGY COSTS $229,029
RECOMMENDED SAVINGS* $105,060 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,567
Cost:
$9,500
$5,231 153,840 $5,336 324 - - - - - - $5,231
153,840
kWh
$5,336
324
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,221
Cost:
-
$1,221 35,913 - - - - - - - - $1,221
35,913
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,312
Cost:
$1,100
$1,830 53,813 $1,482 90 - - - - - - $1,830
53,813
kWh
$1,482
90
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$17,440
Cost:
$18,575
- - - - - - $17,440 1,650 - - -
-
kWh
-
-
kW-months/year
-
-
$
$17,440
1,650
MMBtu
-
-
$
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$14,227
Cost:
$14,700
- - - - - - $14,227 1,346 - - -
-
kWh
-
-
kW-months/year
-
-
$
$14,227
1,346
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$456
Cost:
-
$456 13,403 - - - - - - - - $456
13,403
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,583
Cost:
$99,639
$14,259 419,372 $21,324 1,173 - - - - - - $14,259
419,372
kWh
$21,324
1,173
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,514
Cost:
$2,900
$1,514 44,519 - - - - - - - - $1,514
44,519
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,069
Cost:
$4,175
$2,069 60,841 - - - - - - - - $2,069
60,841
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,117
Cost:
$6,090
- - - - $6,117 - - - - - -
-
kWh
-
-
kW-months/year
$6,117
-
$
-
-
MMBtu
-
-
$
11: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,087
Cost:
$775
$3,087 90,787 - - - - - - - - $3,087
90,787
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
12: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,467
Cost:
-
$1,467 43,133 - - - - - - - - $1,467
43,133
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
13: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$8,000
Cost:
$18,890
- - - - - - - - $8,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$8,000
-
$
TOTAL RECOMMENDED Savings:
$105,060
Cost:
$176,344
$31,134 915,621 $28,142 1,587 $6,117 - $31,667 2,996 $8,000 - $31,134
915,621
kWh
$28,142
1,587
kW-months/year
$6,117
-
$
$31,667
2,996
MMBtu
$8,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material