IAC logo
IAC Assessment: UK1808
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK1808
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2018
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 4
Plant Area (Sq.Ft.) 150,000
Annual Production 1,250 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,709 847,320 kWh $0.03
Electricity Demand $28,431 1,426 kW-months/year $19.94
TOTAL ENERGY COSTS $56,140
RECOMMENDED SAVINGS* $18,613 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,703
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage
$ kWh $ kW-months/year $ Tgal
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$247
Cost:
-
$247 7,474 - - - - $247
7,474
kWh
-
-
kW-months/year
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$459
Cost:
$516
$172 5,224 $287 14 - - $172
5,224
kWh
$287
14
kW-months/year
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$246
Cost:
$133
$246 7,469 - - - - $246
7,469
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,751
Cost:
-
$5,751 174,226 - - - - $5,751
174,226
kWh
-
-
kW-months/year
-
-
Tgal
05: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER Savings:
$11,910
Cost:
$3,700
$(-90) 2,727 - - $12,000 3,000 $(-90)
2,727
kWh
-
-
kW-months/year
$12,000
3,000
Tgal
TOTAL RECOMMENDED Savings:
$18,613
Cost:
$4,349
$6,326 197,120 $287 14 $12,000 3,000 $6,326
197,120
kWh
$287
14
kW-months/year
$12,000
3,000
Tgal
TOTAL IMPLEMENTED Savings:
$6,703
Cost:
$649
$6,416 194,393 $287 14 - - $6,416
194,393
kWh
$287
14
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage