Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Kentucky |
---|---|
Assessment Year | 2019 |
Principal Product | Roll-formed steel parts |
NAICS | 332114 - Custom Roll Forming |
SIC | 3355 - Aluminum Rolling And Drawing, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 135,000 |
Annual Production | 14,400,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $144,425 | 4,228,032 | kWh | $0.03 |
Electricity Demand | $217,540 | 12,778 | kW-months/year | $17.02 |
Electricity Fees | $8,086 | - | $ | - |
Natural Gas | $50,655 | 7,262 | MMBtu | $6.98 |
TOTAL ENERGY COSTS | $423,919 | |||
RECOMMENDED SAVINGS* | $113,739 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $65,489 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,739 Cost: $5,715 |
$3,739 | 109,984 | - | - | - | - | - | - | - | - |
$3,739 109,984 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,381 Cost: $750 |
$4,381 | 128,842 | - | - | - | - | - | - | - | - |
$4,381 128,842 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,843 Cost: $2,270 |
$5,843 | 171,850 | - | - | - | - | - | - | - | - |
$5,843 171,850 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $22,646 Cost: $20,000 |
$7,834 | 230,400 | - | - | $14,812 | 2,122 | - | - | - | - |
$7,834 230,400 kWh |
- - kW-months/year |
$14,812 2,122 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $507 Cost: $245 |
$507 | 14,916 | - | - | - | - | - | - | - | - |
$507 14,916 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $283 Cost: $520 |
$167 | 4,906 | $116 | 7 | - | - | - | - | - | - |
$167 4,906 kWh |
$116 7 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $9,301 Cost: $7,515 |
$5,367 | 157,850 | $3,934 | 246 | - | - | - | - | - | - |
$5,367 157,850 kWh |
$3,934 246 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,566 Cost: $188 |
$885 | 26,040 | $681 | 37 | - | - | - | - | - | - |
$885 26,040 kWh |
$681 37 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $50,440 Cost: $106,123 |
$27,943 | 821,859 | $22,497 | 1,342 | - | - | - | - | - | - |
$27,943 821,859 kWh |
$22,497 1,342 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $265 Cost: $550 |
$128 | 3,772 | $137 | 8 | - | - | - | - | - | - |
$128 3,772 kWh |
$137 8 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $754 Cost: $280 |
$426 | 12,525 | $328 | 18 | - | - | - | - | - | - |
$426 12,525 kWh |
$328 18 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $467 Cost: $360 |
- | - | - | - | - | - | $221 | 630 | $246 | 630 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$221 630 Tgal |
$246 630 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.2514 COVER OPEN TANKS |
Savings: $4,132 Cost: $156 |
- | - | - | - | $4,132 | 592 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,132 592 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $110 Cost: $270 |
- | - | - | - | $110 | 16 | - | - | - | - |
- - kWh |
- - kW-months/year |
$110 16 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.2514 COVER OPEN TANKS |
Savings: $6,024 Cost: $5,000 |
- | - | - | - | $6,024 | 863 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,024 863 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,281 Cost: $1,000 |
- | - | - | - | $3,281 | 470 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,281 470 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $113,739 Cost: $150,942 |
$57,220 | 1,682,944 | $27,693 | 1,657 | $28,359 | 4,063 | $221 | 630 | $246 | 630 | $57,220 1,682,944 kWh |
$27,693 1,657 kW-months/year |
$28,359 4,063 MMBtu |
$221 630 Tgal |
$246 630 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $65,489 Cost: $111,188 |
$39,267 | 1,154,898 | $22,941 | 1,367 | $3,281 | 470 | - | - | - | - | $39,267 1,154,898 kWh |
$22,941 1,367 kW-months/year |
$3,281 470 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal |