IAC logo
IAC Assessment: UL0102
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0102
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1994
Principal Product Asphalt Shingles
NAICS n/a
SIC 2952 - Asphalt Felts And Coatings
Sales $50,000,000-$100,000,000
# of Employees 154
Plant Area (Sq.Ft.) 126,000
Annual Production 4,500,000 Pieces
Production Hrs. Annual 6,432
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $483,800 11,427,316 kWh $0.04
Fuel Oil #2 $585,387 206,074 MMBtu $2.84
TOTAL ENERGY COSTS $1,069,187
RECOMMENDED SAVINGS* $27,562 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,590
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,114
Cost:
$19,020
$9,114 - - - $9,114
-
kWh
-
-
MMBtu
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$13,700
Cost:
$7,500
- - $13,700 4,830 -
-
kWh
$13,700
4,830
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,024
Cost:
$9,700
$4,024 200,762 - - $4,024
200,762
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$452
Cost:
$350
$452 10,844 - - $452
10,844
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$272
Cost:
$745
$272 6,448 - - $272
6,448
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,562
Cost:
$37,315
$13,862 218,054 $13,700 4,830 $13,862
218,054
kWh
$13,700
4,830
MMBtu
TOTAL IMPLEMENTED Savings:
$13,590
Cost:
$29,070
$13,590 211,606 - - $13,590
211,606
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2