IAC logo
IAC Assessment: UL0117
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1995
Principal Product Denim Blue Jeans
NAICS n/a
SIC 2263 -
Sales $5,000,000-$10,000,000
# of Employees 10
Plant Area (Sq.Ft.) 25,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 8,064
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,865 4,072,978 kWh $0.05
Natural Gas $15,750 3,559 MMBtu $4.43
TOTAL ENERGY COSTS $387,875
RECOMMENDED SAVINGS* $95,582 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ MMBtu $ Tgal $ lb
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$149
Cost:
$25
$149 2,931 - - - - - - $149
2,931
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,441
Cost:
$22,850
$4,441 86,460 - - - - - - $4,441
86,460
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,046
Cost:
$808
$1,046 - - - - - - - $1,046
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$1,593
Cost:
$1,146
- - $1,593 360 - - - - -
-
kWh
$1,593
360
MMBtu
-
-
Tgal
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,993
Cost:
$2,077
$1,993 38,980 - - - - - - $1,993
38,980
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 3.4155 METER WASTE WATER Savings:
$8,000
Cost:
$1,000
- - - - $8,000 - - - -
-
kWh
-
-
MMBtu
$8,000
-
Tgal
-
-
lb
07: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$70,000
Cost:
$8,000
- - - - $70,000 34,000,000 - - -
-
kWh
-
-
MMBtu
$70,000
34,000,000
Tgal
-
-
lb
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,100
Cost:
$5,000
- - - - - - $3,100 18,000 -
-
kWh
-
-
MMBtu
-
-
Tgal
$3,100
18,000
lb
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,660
Cost:
$1,000
- - - - $1,660 42,000 - - -
-
kWh
-
-
MMBtu
$1,660
42,000
Tgal
-
-
lb
10: 3.6113 REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS Savings:
$3,600
Cost:
$5,000
- - - - $3,600 1,000,000 - - -
-
kWh
-
-
MMBtu
$3,600
1,000,000
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$95,582
Cost:
$46,906
$7,629 128,371 $1,593 360 $83,260 35,042,000 $3,100 18,000 $7,629
128,371
kWh
$1,593
360
MMBtu
$83,260
35,042,000
Tgal
$3,100
18,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)