IAC Assessment: UL0118
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0118
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1995
Principal Product Stone washed blue jeans
NAICS n/a
SIC 2263 -
Sales $1,000,000-$5,000,000
# of Employees 125
Plant Area (Sq.Ft.) 87,000
Annual Production 3,750,000 Pieces
Production Hrs. Annual 8,400
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,282 1,718,640 kWh $0.06
Natural Gas $268,293 61,243 MMBtu $4.38
TOTAL ENERGY COSTS $492,775
RECOMMENDED SAVINGS* $114,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ MMBtu $ Tgal $ lb
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$20,589
Cost:
$2,000
- - $20,589 4,701 - - - - -
-
kWh
$20,589
4,701
MMBtu
-
-
Tgal
-
-
lb
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$586
Cost:
$10
$586 10,551 - - - - - - $586
10,551
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,551
Cost:
$4,400
$5,551 100,234 - - - - - - $5,551
100,234
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,879
Cost:
$1,583
$1,879 38,394 - - - - - - $1,879
38,394
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$24,960
Cost:
$12,260
$24,960 - - - - - - - $24,960
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 3.4155 METER WASTE WATER Savings:
$24,300
Cost:
$1,000
- - - - $24,300 - - - -
-
kWh
-
-
MMBtu
$24,300
-
Tgal
-
-
lb
07: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$33,500
Cost:
$10,500
- - - - $33,500 13,000,000 - - -
-
kWh
-
-
MMBtu
$33,500
13,000,000
Tgal
-
-
lb
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,800
Cost:
$5,000
- - - - - - $2,800 200,000 -
-
kWh
-
-
MMBtu
-
-
Tgal
$2,800
200,000
lb
TOTAL RECOMMENDED Savings:
$114,165
Cost:
$36,753
$32,976 149,179 $20,589 4,701 $57,800 13,000,000 $2,800 200,000 $32,976
149,179
kWh
$20,589
4,701
MMBtu
$57,800
13,000,000
Tgal
$2,800
200,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)