Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1995 |
Principal Product | Extruded Aluminum Parts |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 3,500,000 Pounds |
Production Hrs. Annual | 4,160 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $244,347 | 4,970,399 | kWh | $0.05 |
Natural Gas | $126,304 | 34,404 | MMBtu | $3.67 |
TOTAL ENERGY COSTS | $448,351 | |||
RECOMMENDED SAVINGS* | $24,339 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,542 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,122 Cost: $1,816 |
$3,122 | 63,599 | - | - | - | - | - | - |
$3,122 63,599 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $897 Cost: $1,476 |
$897 | 18,171 | - | - | - | - | - | - |
$897 18,171 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,274 Cost: $40 |
$1,274 | 25,791 | - | - | - | - | - | - |
$1,274 25,791 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $708 Cost: $1,000 |
- | - | $708 | 193 | - | - | - | - |
- - kWh |
$708 193 MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $438 Cost: $36 |
$438 | 8,792 | - | - | - | - | - | - |
$438 8,792 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $15,000 Cost: $18,720 |
- | - | - | - | $15,000 | 35,337 | - | - |
- - kWh |
- - MMBtu |
$15,000 35,337 Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,100 Cost: - |
- | - | - | - | - | - | $2,100 | 225,504 |
- - kWh |
- - MMBtu |
- - Tgal |
$2,100 225,504 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $800 Cost: - |
- | - | - | - | - | - | $800 | 108,000 |
- - kWh |
- - MMBtu |
- - Tgal |
$800 108,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,339 Cost: $23,088 |
$5,731 | 116,353 | $708 | 193 | $15,000 | 35,337 | $2,900 | 333,504 | $5,731 116,353 kWh |
$708 193 MMBtu |
$15,000 35,337 Tgal |
$2,900 333,504 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,542 Cost: $2,892 |
$4,834 | 98,182 | $708 | 193 | - | - | - | - | $4,834 98,182 kWh |
$708 193 MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) |