Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1995
Principal Product Aluminum Extrusions
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 140,000
Annual Production 10,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $361,875 8,083,529 kWh $0.04
Natural Gas $279,774 77,658 MMBtu $3.60
TOTAL ENERGY COSTS $952,649
RECOMMENDED SAVINGS* $327,377 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ MMBtu $ Tgal $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,409
Cost:
$40
$1,409 31,360 - - - - - - $1,409
31,360
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,052
Cost:
$2,000
- - $10,052 2,983 - - - - -
-
kWh
$10,052
2,983
MMBtu
-
-
Tgal
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$781
Cost:
$1,367
$781 17,585 - - - - - - $781
17,585
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$380
Cost:
$70
$380 8,499 - - - - - - $380
8,499
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$20,686
Cost:
$17,000
$20,686 - - - - - - - $20,686
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,939
Cost:
$6,091
$4,939 78,839 - - - - - - $4,939
78,839
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
07: 3.3123 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS Savings:
$67,000
Cost:
$226,000
- - - - $67,000 89,375 - - -
-
kWh
-
-
MMBtu
$67,000
89,375
Tgal
-
-
lb
08: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$111,000
Cost:
$376,000
- - - - $111,000 89,375 - - -
-
kWh
-
-
MMBtu
$111,000
89,375
Tgal
-
-
lb
09: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$100,000
Cost:
$251,000
- - - - $100,000 89,375 - - -
-
kWh
-
-
MMBtu
$100,000
89,375
Tgal
-
-
lb
10: 3.4155 METER WASTE WATER Savings:
$5,970
Cost:
$1,000
- - - - $5,970 7,600,000 - - -
-
kWh
-
-
MMBtu
$5,970
7,600,000
Tgal
-
-
lb
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,200
Cost:
-
- - - - - - $4,200 15,000 -
-
kWh
-
-
MMBtu
-
-
Tgal
$4,200
15,000
lb
12: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$960
Cost:
-
- - - - - - $960 1,500 -
-
kWh
-
-
MMBtu
-
-
Tgal
$960
1,500
lb
TOTAL RECOMMENDED Savings:
$327,377
Cost:
$880,568
$28,195 136,283 $10,052 2,983 $283,970 7,868,125 $5,160 16,500 $28,195
136,283
kWh
$10,052
2,983
MMBtu
$283,970
7,868,125
Tgal
$5,160
16,500
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)