IAC logo
IAC Assessment: UL0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1995
Principal Product Portland and Masonary Cement
NAICS n/a
SIC 3241 - Cement, Hydraulic
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 218,000
Annual Production 700,000 Tons
Production Hrs. Annual 4,160
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,528,156 120,035,172 kWh $0.03
TOTAL ENERGY COSTS $3,698,513
RECOMMENDED SAVINGS* $357,621 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Other Liquid (non-haz) Electricity Usage Other Liquid (non-haz)
$ kWh $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,303
Cost:
$1,182
$1,303 44,256 - - $1,303
44,256
kWh
-
-
gal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,928
Cost:
$17,506
$8,928 303,927 - - $8,928
303,927
kWh
-
-
gal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$299,690
Cost:
$80
$299,690 10,201,641 - - $299,690
10,201,641
kWh
-
-
gal
04: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$5,700
Cost:
-
- - $5,700 20,357 -
-
kWh
$5,700
20,357
gal
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$25,000
Cost:
$800
- - $25,000 14,000 -
-
kWh
$25,000
14,000
gal
06: 3.5143 RETURN SPENT SOLUTIONS TO THE MANUFACTURER Savings:
$17,000
Cost:
$800
- - $17,000 10,500 -
-
kWh
$17,000
10,500
gal
TOTAL RECOMMENDED Savings:
$357,621
Cost:
$20,368
$309,921 10,549,824 $47,700 44,857 $309,921
10,549,824
kWh
$47,700
44,857
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
gal
Savings
Cost
$ kWh $ gal
Electricity Usage Other Liquid (non-haz) Electricity Usage Other Liquid (non-haz)