DOE MESC
IAC logo
IAC Assessment: UL0150
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Automative Exhaust Systems
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 85,000
Annual Production 320,000 Pieces
Production Hrs. Annual 6,624
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,424 6,004,103 kWh $0.02
Electricity Demand $92,375 13,258 kW-months/year $6.97
Electricity Fees $2,052 - $ -
Natural Gas $61,368 18,603 MMBtu $3.30
TOTAL ENERGY COSTS $594,219
RECOMMENDED SAVINGS* $210,289 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,289
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$27,420
Cost:
$2,000
- - - - $27,420 8,309 - - -
-
kWh
-
-
kW-months/year
$27,420
8,309
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$964
Cost:
$921
$588 28,136 $376 102 - - - - $588
28,136
kWh
$376
102
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,555
Cost:
$4,500
$1,592 76,202 $963 260 - - - - $1,592
76,202
kWh
$963
260
kW-months/year
-
-
MMBtu
-
-
lb
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$175,000
Cost:
$1,800
- - - - - - $175,000 57,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$175,000
57,000
lb
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,825
Cost:
-
- - - - - - $2,825 18,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,825
18,000
lb
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,525
Cost:
-
- - - - - - $1,525 12,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,525
12,000
lb
TOTAL RECOMMENDED Savings:
$210,289
Cost:
$9,221
$2,180 104,338 $1,339 362 $27,420 8,309 $179,350 87,000 $2,180
104,338
kWh
$1,339
362
kW-months/year
$27,420
8,309
MMBtu
$179,350
87,000
lb
TOTAL IMPLEMENTED Savings:
$35,289
Cost:
$7,421
$2,180 104,338 $1,339 362 $27,420 8,309 $4,350 30,000 $2,180
104,338
kWh
$1,339
362
kW-months/year
$27,420
8,309
MMBtu
$4,350
30,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)