IAC logo
IAC Assessment: UL0155
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0155
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Edible Oils and Shortenings
NAICS n/a
SIC 2079 - Edible Fats And Oils, Nec
Sales $100,000,000-$500,000,000
# of Employees 155
Plant Area (Sq.Ft.) 55,000
Annual Production 225,000,000 Pounds
Production Hrs. Annual 8,568
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $348,371 14,178,488 kWh $0.02
Electricity Demand $194,385 27,679 kW-months/year $7.02
Natural Gas $202,407 41,799 MMBtu $4.84
TOTAL ENERGY COSTS $1,016,163
RECOMMENDED SAVINGS* $222,286 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,626
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,677
Cost:
$2,000
- - - - $4,677 966 - - - - -
-
kWh
-
-
kW-months/year
$4,677
966
MMBtu
-
-
Tgal
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,243
Cost:
$40
$893 36,342 $350 50 - - - - - - $893
36,342
kWh
$350
50
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$591
Cost:
$44
$425 17,292 $166 24 - - - - - - $425
17,292
kWh
$166
24
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$826
Cost:
$18,690
$566 23,154 $260 37 - - - - - - $566
23,154
kWh
$260
37
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,949
Cost:
$9,950
$4,228 172,040 $1,721 239 - - - - - - $4,228
172,040
kWh
$1,721
239
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$209,000
Cost:
$330,000
- - - - - - $118,000 32,500,000 $91,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$118,000
32,500,000
Tgal
$91,000
-
$
TOTAL RECOMMENDED Savings:
$222,286
Cost:
$360,724
$6,112 248,828 $2,497 350 $4,677 966 $118,000 32,500,000 $91,000 - $6,112
248,828
kWh
$2,497
350
kW-months/year
$4,677
966
MMBtu
$118,000
32,500,000
Tgal
$91,000
-
$
TOTAL IMPLEMENTED Savings:
$10,626
Cost:
$11,950
$4,228 172,040 $1,721 239 $4,677 966 - - - - $4,228
172,040
kWh
$1,721
239
kW-months/year
$4,677
966
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes