IAC logo
IAC Assessment: UL0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Cooling Towers
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $50,000,000-$100,000,000
# of Employees 220
Plant Area (Sq.Ft.) 200,000
Annual Production 3,400 Pieces
Production Hrs. Annual 7,488
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,547 5,136,870 kWh $0.03
Electricity Demand $98,610 10,832 kW-months/year $9.10
Natural Gas $84,663 22,367 MMBtu $3.79
TOTAL ENERGY COSTS $382,042
RECOMMENDED SAVINGS* $26,719 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,049
Cost:
$1,157
$682 26,964 $367 40 - - - - $682
26,964
kWh
$367
40
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$81
Cost:
$2,160
$30 1,172 $51 6 - - - - $30
1,172
kWh
$51
6
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$951
Cost:
$87
$502 19,637 $449 49 - - - - $502
19,637
kWh
$449
49
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$330
Cost:
$230
- - - - $330 87 - - -
-
kWh
-
-
kW-months/year
$330
87
MMBtu
-
-
lb
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$553
Cost:
$200
- - - - $553 146 - - -
-
kWh
-
-
kW-months/year
$553
146
MMBtu
-
-
lb
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$10,233
Cost:
-
- - - - - - $10,233 45,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,233
45,000
lb
07: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$1,714
Cost:
$600
- - - - - - $1,714 5,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,714
5,000
lb
08: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$11,808
Cost:
-
- - - - - - $11,808 45,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,808
45,000
lb
TOTAL RECOMMENDED Savings:
$26,719
Cost:
$4,434
$1,214 47,773 $867 95 $883 233 $23,755 95,000 $1,214
47,773
kWh
$867
95
kW-months/year
$883
233
MMBtu
$23,755
95,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)