IAC logo
IAC Assessment: UL0167
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0167
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Packing Material, Corrugated Boxes and Displays
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 113,000
Annual Production 436,440,000 Thousand Feet
Production Hrs. Annual 4,290
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,495 2,900,059 kWh $0.04
Electricity Demand $46,084 5,082 kW-months/year $9.07
Natural Gas $13,816 3,524 MMBtu $3.92
TOTAL ENERGY COSTS $180,195
RECOMMENDED SAVINGS* $32,304 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$715
Cost:
$7,590
$435 11,723 $280 31 - - - - - - - - - - - - $435
11,723
kWh
$280
31
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$270
Cost:
$1,493
$161 4,396 $109 12 - - - - - - - - - - - - $161
4,396
kWh
$109
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$670
Cost:
$20
$399 10,551 $271 30 - - - - - - - - - - - - $399
10,551
kWh
$271
30
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,860
Cost:
$200
- - - - $1,860 170 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,860
170
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,539
Cost:
$200
- - - - $1,539 393 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,539
393
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$9,000
Cost:
-
- - - - - - $4,200 2,000 - - - - - - $4,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,200
2,000
lb
-
-
$
-
-
$
-
-
$
$4,800
-
$
07: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$1,500
Cost:
$75
- - - - - - $600 1,800 $(-1,800) - - - - - $2,700 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$600
1,800
lb
$(-1,800)
-
$
-
-
$
-
-
$
$2,700
-
$
08: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$16,750
Cost:
$25,000
- - - - - - - - - - $(-2,000) - $18,750 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$(-2,000)
-
$
$18,750
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,304
Cost:
$34,578
$995 26,670 $660 73 $3,399 563 $4,800 3,800 $(-1,800) - $(-2,000) - $18,750 - $7,500 - $995
26,670
kWh
$660
73
kW-months/year
$3,399
563
MMBtu
$4,800
3,800
lb
$(-1,800)
-
$
$(-2,000)
-
$
$18,750
-
$
$7,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost