IAC Assessment: UL0173
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0173
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Bulk Materials Handling Equipment
NAICS n/a
SIC 3535 - Conveyors And Conveying Equipment
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 20,000
Annual Production 250 Pieces
Production Hrs. Annual 2,040
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,732 545,721 kWh $0.05
Natural Gas $17,379 3,251 MMBtu $5.35
TOTAL ENERGY COSTS $48,620
RECOMMENDED SAVINGS* $18,014 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,979
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Primary Raw Material Ancillary Material Cost Electricity Usage Natural Gas Solid Waste (non-haz) Primary Raw Material Ancillary Material Cost
$ kWh $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$40
Cost:
$537
$40 879 - - - - - - - - $40
879
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,502
Cost:
$500
- - $1,502 281 - - - - - - -
-
kWh
$1,502
281
MMBtu
-
-
lb
-
-
$
-
-
$
03: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$49
Cost:
-
- - - - $49 10,000 - - - - -
-
kWh
-
-
MMBtu
$49
10,000
lb
-
-
$
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$100
Cost:
$190
- - - - - - - - $100 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
$100
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$393
Cost:
-
- - - - $393 20,800 - - - - -
-
kWh
-
-
MMBtu
$393
20,800
lb
-
-
$
-
-
$
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$15,930
Cost:
$7,600
- - - - - - $15,600 - $330 - -
-
kWh
-
-
MMBtu
-
-
lb
$15,600
-
$
$330
-
$
TOTAL RECOMMENDED Savings:
$18,014
Cost:
$8,827
$40 879 $1,502 281 $442 30,800 $15,600 - $430 - $40
879
kWh
$1,502
281
MMBtu
$442
30,800
lb
$15,600
-
$
$430
-
$
TOTAL IMPLEMENTED Savings:
$15,979
Cost:
$7,600
- - - - $49 10,000 $15,600 - $330 - -
-
kWh
-
-
MMBtu
$49
10,000
lb
$15,600
-
$
$330
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Primary Raw Material Ancillary Material Cost Electricity Usage Natural Gas Solid Waste (non-haz) Primary Raw Material Ancillary Material Cost