IAC logo
IAC Assessment: UL0176
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0176
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1997
Principal Product Letterpress and Lithographic Printing
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 69,790
Annual Production 0 Pieces
Production Hrs. Annual 7,776
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,459 3,606,682 kWh $0.03
Electricity Demand $73,434 7,638 kW-months/year $9.61
TOTAL ENERGY COSTS $197,861
RECOMMENDED SAVINGS* $422,588 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $802
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$802
Cost:
$1,661
$444 16,413 $358 37 - - - - - - - - - - $444
16,413
kWh
$358
37
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$136
Cost:
$3,180
$88 3,224 $48 5 - - - - - - - - - - $88
3,224
kWh
$48
5
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$45,321
Cost:
-
- - - - $3,640 1,425 - - - - $41,681 - - - -
-
kWh
-
-
kW-months/year
$3,640
1,425
gal
-
-
lb
-
-
$
$41,681
-
$
-
-
$
04: 4.2310 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$11,180
Cost:
$4,500
- - - - - - - - $11,180 - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$11,180
-
$
-
-
$
-
-
$
05: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$9,373
Cost:
$400
- - - - - - $373 60,000 - - $9,000 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$373
60,000
lb
-
-
$
$9,000
-
$
-
-
$
06: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$355,776
Cost:
$77,600
- - - - - - - - - - - - $355,776 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
$355,776
-
$
TOTAL RECOMMENDED Savings:
$422,588
Cost:
$87,341
$532 19,637 $406 42 $3,640 1,425 $373 60,000 $11,180 - $50,681 - $355,776 - $532
19,637
kWh
$406
42
kW-months/year
$3,640
1,425
gal
$373
60,000
lb
$11,180
-
$
$50,681
-
$
$355,776
-
$
TOTAL IMPLEMENTED Savings:
$802
Cost:
$1,661
$444 16,413 $358 37 - - - - - - - - - - $444
16,413
kWh
$358
37
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost