Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1998 |
Principal Product | Automotive Gears |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 152,150 |
Annual Production | 25,400,000 Pounds |
Production Hrs. Annual | 5,760 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $558,423 | 15,140,094 | kWh | $0.04 |
Electricity Demand | $309,599 | 29,235 | kW-months/year | $10.59 |
Natural Gas | $801,441 | 220,429 | MMBtu | $3.64 |
TOTAL ENERGY COSTS | $1,772,113 | |||
RECOMMENDED SAVINGS* | $27,929 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,063 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,970 Cost: $10,350 |
$4,363 | 118,113 | $2,607 | 246 | - | - |
$4,363 118,113 kWh |
$2,607 246 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,343 Cost: $20 |
$3,971 | 107,562 | $2,372 | 224 | - | - |
$3,971 107,562 kWh |
$2,372 224 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,416 Cost: $20,821 |
$2,746 | 74,443 | $2,670 | 258 | - | - |
$2,746 74,443 kWh |
$2,670 258 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $2,400 Cost: - |
- | - | - | - | $2,400 | 216,000 |
- - kWh |
- - kW-months/year |
$2,400 216,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $3,750 Cost: - |
- | - | - | - | $3,750 | 125,000 |
- - kWh |
- - kW-months/year |
$3,750 125,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $3,050 Cost: - |
- | - | - | - | $3,050 | 400,000 |
- - kWh |
- - kW-months/year |
$3,050 400,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,929 Cost: $31,191 |
$11,080 | 300,118 | $7,649 | 728 | $9,200 | 741,000 | $11,080 300,118 kWh |
$7,649 728 kW-months/year |
$9,200 741,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,063 Cost: $10,370 |
$8,334 | 225,675 | $4,979 | 470 | $3,750 | 125,000 | $8,334 225,675 kWh |
$4,979 470 kW-months/year |
$3,750 125,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |