IAC Assessment: UL2213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2022
Principal Product Flat Roll Steel
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 38
Plant Area (Sq.Ft.) 100,000
Annual Production 116,650 Tons
Production Hrs. Annual 7,800
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,689 937,200 kWh $0.03
Electricity Demand $79,511 3,728 kW-months/year $21.33
Electricity Fees $9,361 - $ -
Natural Gas $39,109 3,085 MMBtu $12.68
TOTAL ENERGY COSTS $155,670
RECOMMENDED SAVINGS* $65,196 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,633
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,500
Cost:
-
- - - - $11,500 - - - -
-
kWh
-
-
kW-months/year
$11,500
-
$
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$700
Cost:
$562
$332 11,243 $368 17 - - - - $332
11,243
kWh
$368
17
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,339
Cost:
-
$659 22,310 $680 32 - - - - $659
22,310
kWh
$680
32
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$124
Cost:
$564
$124 4,193 - - - - - - $124
4,193
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,734
Cost:
$1,440
$1,734 58,701 - - - - - - $1,734
58,701
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$447
Cost:
-
$84 2,844 - - - - $363 35 $84
2,844
kWh
-
-
kW-months/year
-
-
$
$363
35
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,277
Cost:
$10,869
$430 14,554 $3,847 179 - - - - $430
14,554
kWh
$3,847
179
kW-months/year
-
-
$
-
-
MMBtu
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$45,075
Cost:
$458,134
$19,721 667,609 $25,354 1,189 - - - - $19,721
667,609
kWh
$25,354
1,189
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$65,196
Cost:
$471,569
$23,084 781,454 $30,249 1,417 $11,500 - $363 35 $23,084
781,454
kWh
$30,249
1,417
kW-months/year
$11,500
-
$
$363
35
MMBtu
TOTAL IMPLEMENTED Savings:
$47,633
Cost:
$460,700
$21,911 741,746 $25,722 1,206 - - - - $21,911
741,746
kWh
$25,722
1,206
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas