Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2023
Principal Product Nanowire and Nanowire materials
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 19,022
Annual Production 165,347 Pounds
Production Hrs. Annual 3,200
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,515 334,155 kWh $0.05
Electricity Demand $54,156 2,267 kW-months/year $23.89
Electricity Fees $15,472 - $ -
Natural Gas $8,662 745 MMBtu $11.63
TOTAL ENERGY COSTS $95,805
RECOMMENDED SAVINGS* $136,224 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Primary Raw Material
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,408
Cost:
$2,832
$906 17,414 $2,502 105 - - - - $906
17,414
kWh
$2,502
105
kW-months/year
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,141
Cost:
$9,184
- - - - $5,141 - - - -
-
kWh
-
-
kW-months/year
$5,141
-
$
-
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$33,531
Cost:
$260,163
$17,369 334,026 $16,162 677 - - - - $17,369
334,026
kWh
$16,162
677
kW-months/year
-
-
$
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,944
Cost:
-
- - $8,944 374 - - - - -
-
kWh
$8,944
374
kW-months/year
-
-
$
-
-
$
05: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$85,200
Cost:
$50,198
- - - - - - $85,200 - -
-
kWh
-
-
kW-months/year
-
-
$
$85,200
-
$
TOTAL RECOMMENDED Savings:
$136,224
Cost:
$322,377
$18,275 351,440 $27,608 1,156 $5,141 - $85,200 - $18,275
351,440
kWh
$27,608
1,156
kW-months/year
$5,141
-
$
$85,200
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Primary Raw Material