IAC Assessment: UM0019
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0019
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1995
Principal Product Automotive wheels
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 562,496
Annual Production 3,500,000 Pieces
Production Hrs. Annual 5,720
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $980,623 18,235,346 kWh $0.05
Natural Gas $1,105,108 401,844 MMBtu $2.75
TOTAL ENERGY COSTS $2,085,731
RECOMMENDED SAVINGS* $97,611 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,344
Cost:
$12,265
$7,344 135,991 - - $7,344
135,991
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,150
Cost:
$57,583
$29,150 540,152 - - $29,150
540,152
kWh
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$48,220
Cost:
$67,860
$48,220 - - - $48,220
-
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$558
Cost:
$585
- - $558 203 -
-
kWh
$558
203
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,452
Cost:
-
- - $4,452 1,619 -
-
kWh
$4,452
1,619
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,887
Cost:
$3,468
- - $7,887 2,868 -
-
kWh
$7,887
2,868
MMBtu
TOTAL RECOMMENDED Savings:
$97,611
Cost:
$141,761
$84,714 676,143 $12,897 4,690 $84,714
676,143
kWh
$12,897
4,690
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas