IAC logo
IAC Assessment: UM0042
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0042
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1995
Principal Product Steel Automotive parts
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 300,000
Annual Production 1,700,000 Pieces
Production Hrs. Annual 4,576
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,178,289 21,526,378 kWh $0.05
Natural Gas $288,760 85,109 MMBtu $3.39
TOTAL ENERGY COSTS $1,467,049
RECOMMENDED SAVINGS* $51,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,315
Cost:
$12,150
$2,315 41,911 - - $2,315
41,911
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,676
Cost:
$21,703
$2,676 48,652 - - $2,676
48,652
kWh
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$27,333
Cost:
$85,000
$27,333 - - - $27,333
-
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,959
Cost:
$350
$2,959 53,927 - - $2,959
53,927
kWh
-
-
MMBtu
05: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$8,994
Cost:
$2,960
- - $8,994 2,653 -
-
kWh
$8,994
2,653
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,633
Cost:
$2,650
- - $7,633 2,252 -
-
kWh
$7,633
2,252
MMBtu
TOTAL RECOMMENDED Savings:
$51,910
Cost:
$124,813
$35,283 144,490 $16,627 4,905 $35,283
144,490
kWh
$16,627
4,905
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu