Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1996 |
Principal Product | Hydraulic Clutch Actuators |
NAICS | n/a |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $50,000,000-$100,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 121,440 |
Annual Production | 1,200,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $209,082 | 3,245,018 | kWh | $0.06 |
Electricity Demand | $115,006 | 6,998 | kW-months/year | $16.43 |
Natural Gas | $13,123 | 3,169 | MMBtu | $4.14 |
TOTAL ENERGY COSTS | $347,815 | |||
RECOMMENDED SAVINGS* | $59,730 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,506 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $880 Cost: $5,920 |
$571 | 8,792 | $309 | 22 | - | - | - | - | - | - | - | - | - | - |
$571 8,792 kWh |
$309 22 kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,468 Cost: $30,512 |
$6,530 | 101,993 | $2,938 | 204 | - | - | - | - | - | - | - | - | - | - |
$6,530 101,993 kWh |
$2,938 204 kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,753 Cost: $400 |
$1,909 | 29,601 | $844 | 60 | - | - | - | - | - | - | - | - | - | - |
$1,909 29,601 kWh |
$844 60 kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,901 Cost: $500 |
$1,315 | 20,516 | $586 | 36 | - | - | - | - | - | - | - | - | - | - |
$1,315 20,516 kWh |
$586 36 kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $1,114 Cost: $500 |
- | - | - | - | $1,114 | 269 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,114 269 MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5111 FILTER AND REUSE HYDRAULIC OIL |
Savings: $35,759 Cost: $4,010 |
- | - | - | - | - | - | $2,759 | 3,300 | - | - | - | - | $33,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,759 3,300 gal |
- - gal |
- - lb |
$33,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.8133 CONVERT TO AQUEOUS CLEANING |
Savings: $55 Cost: $530 |
- | - | - | - | - | - | - | - | $55 | 55 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$55 55 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $7,800 Cost: - |
- | - | - | - | - | - | - | - | - | - | $7,800 | 93,600 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - gal |
$7,800 93,600 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $59,730 Cost: $42,372 |
$10,325 | 160,902 | $4,677 | 322 | $1,114 | 269 | $2,759 | 3,300 | $55 | 55 | $7,800 | 93,600 | $33,000 | - | $10,325 160,902 kWh |
$4,677 322 kW-months/year |
$1,114 269 MMBtu |
$2,759 3,300 gal |
$55 55 gal |
$7,800 93,600 lb |
$33,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,506 Cost: $10,830 |
$2,480 | 38,393 | $1,153 | 82 | $1,114 | 269 | $2,759 | 3,300 | - | - | - | - | $33,000 | - | $2,480 38,393 kWh |
$1,153 82 kW-months/year |
$1,114 269 MMBtu |
$2,759 3,300 gal |
- - gal |
- - lb |
$33,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Primary Raw Material |