IAC logo
IAC Assessment: UM0074
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0074
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1996
Principal Product Manufacture Stamping Dies
NAICS n/a
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 215,000
Annual Production 150 Pieces
Production Hrs. Annual 7,200
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,572 4,681,419 kWh $0.03
Electricity Demand $173,545 10,608 kW-months/year $16.36
Electricity Fees $(-6,294) - $ -
Natural Gas $78,023 17,804 MMBtu $4.38
TOTAL ENERGY COSTS $415,187
RECOMMENDED SAVINGS* $51,259 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,074
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,899
Cost:
$16,317
$4,137 108,734 $2,762 194 - - - - $4,137
108,734
kWh
$2,762
194
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,905
Cost:
$28,221
$11,412 166,471 $6,493 456 - - - - $11,412
166,471
kWh
$6,493
456
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$365
Cost:
$500
$358 3,810 $7 1 - - - - $358
3,810
kWh
$7
1
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,903
Cost:
$4,000
- - - - $3,903 891 - - -
-
kWh
-
-
kW-months/year
$3,903
891
MMBtu
-
-
lb
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$9,905
Cost:
$30,800
- - - - $9,905 2,395 - - -
-
kWh
-
-
kW-months/year
$9,905
2,395
MMBtu
-
-
lb
06: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$12,282
Cost:
$4,095
- - - - - - $12,282 21 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,282
21
lb
TOTAL RECOMMENDED Savings:
$51,259
Cost:
$83,933
$15,907 279,015 $9,262 651 $13,808 3,286 $12,282 21 $15,907
279,015
kWh
$9,262
651
kW-months/year
$13,808
3,286
MMBtu
$12,282
21
lb
TOTAL IMPLEMENTED Savings:
$35,074
Cost:
$75,838
$15,907 279,015 $9,262 651 $9,905 2,395 - - $15,907
279,015
kWh
$9,262
651
kW-months/year
$9,905
2,395
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb