Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Industrial Plating
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 79
Plant Area (Sq.Ft.) 63,000
Annual Production 132,583,100 Pounds
Production Hrs. Annual 7,344
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $283,752 4,235,346 kWh $0.07
Electricity Demand $84,183 17,604 kW-months/year $4.78
Electricity Fees $(-5,257) - $ -
Natural Gas $242,233 72,218 MMBtu $3.35
TOTAL ENERGY COSTS $667,197
RECOMMENDED SAVINGS* $110,385 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,948
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$171
Cost:
$150
$156 2,052 $15 3 - - - - - - - - $156
2,052
kWh
$15
3
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,736
Cost:
$8,779
$5,188 69,461 $548 112 - - - - - - - - $5,188
69,461
kWh
$548
112
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,162
Cost:
$306
- - - - $1,162 347 - - - - - - -
-
kWh
-
-
kW-months/year
$1,162
347
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,126
Cost:
$3,838
- - - - $4,126 1,133 - - - - - - -
-
kWh
-
-
kW-months/year
$4,126
1,133
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$30,942
Cost:
$140,140
- - - - - - $30,942 10,900,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$30,942
10,900,000
Tgal
-
-
$
-
-
$
06: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$6,915
Cost:
$320
- - - - - - - - $6,915 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$6,915
-
$
-
-
$
07: 3.2161 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE Savings:
$61,333
Cost:
$480
- - - - - - - - - - $61,333 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$61,333
-
$
TOTAL RECOMMENDED Savings:
$110,385
Cost:
$154,013
$5,344 71,513 $563 115 $5,288 1,480 $30,942 10,900,000 $6,915 - $61,333 - $5,344
71,513
kWh
$563
115
kW-months/year
$5,288
1,480
MMBtu
$30,942
10,900,000
Tgal
$6,915
-
$
$61,333
-
$
TOTAL IMPLEMENTED Savings:
$16,948
Cost:
$13,087
$5,344 71,513 $563 115 $4,126 1,133 - - $6,915 - - - $5,344
71,513
kWh
$563
115
kW-months/year
$4,126
1,133
MMBtu
-
-
Tgal
$6,915
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Product