Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1997 |
Principal Product | Automotive Acoustical |
NAICS | n/a |
SIC | 3086 - Plastics Foam Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 67,000 |
Annual Production | 29,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $187,497 | 2,091,149 | kWh | $0.09 |
Electricity Fees | $6,568 | - | $ | - |
Natural Gas | $36,004 | 8,597 | MMBtu | $4.19 |
TOTAL ENERGY COSTS | $290,129 | |||
RECOMMENDED SAVINGS* | $76,297 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $65,512 |
#|Description |
Savings Cost |
Status | Electricity Usage | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Electricity Usage | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $5,153 Cost: $4,400 |
$5,153 | 51,876 | - | - | - | - | - | - |
$5,153 51,876 kWh |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,925 Cost: $22,088 |
$7,925 | 70,340 | - | - | - | - | - | - |
$7,925 70,340 kWh |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $11,401 Cost: $250 |
- | - | - | - | $11,401 | - | - | - |
- - kWh |
- - lb |
$11,401 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,603 Cost: $1,000 |
$2,603 | 26,084 | - | - | - | - | - | - |
$2,603 26,084 kWh |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $257 Cost: $800 |
$257 | 2,638 | - | - | - | - | - | - |
$257 2,638 kWh |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $48,048 Cost: - |
- | - | $48,048 | 327,101 | - | - | - | - |
- - kWh |
$48,048 327,101 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $910 Cost: $300 |
- | - | - | - | - | - | $910 | - |
- - kWh |
- - lb |
- - $ |
$910 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $76,297 Cost: $28,838 |
$15,938 | 150,938 | $48,048 | 327,101 | $11,401 | - | $910 | - | $15,938 150,938 kWh |
$48,048 327,101 lb |
$11,401 - $ |
$910 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $65,512 Cost: $4,950 |
$5,153 | 51,876 | $48,048 | 327,101 | $11,401 | - | $910 | - | $5,153 51,876 kWh |
$48,048 327,101 lb |
$11,401 - $ |
$910 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||