IAC Assessment: UM0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Automotive Assembly Lines
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 51,000
Annual Production 50 Pieces
Production Hrs. Annual 4,186
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,104 1,181,125 kWh $0.10
Electricity Fees $5,608 - $ -
Natural Gas $28,227 7,483 MMBtu $3.77
TOTAL ENERGY COSTS $192,594
RECOMMENDED SAVINGS* $70,017 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,163
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product
$ kWh $ MMBtu $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$547
Cost:
$900
$547 5,569 - - - - - - - - $547
5,569
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,724
Cost:
$39,196
$8,724 87,632 - - - - - - - - $8,724
87,632
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,308
Cost:
$40,000
- - - - - - $10,308 - - - -
-
kWh
-
-
MMBtu
-
-
lb
$10,308
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$735
Cost:
$600
$735 7,034 - - - - - - - - $735
7,034
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,333
Cost:
$1,400
- - $2,333 619 - - - - - - -
-
kWh
$2,333
619
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$583
Cost:
-
- - - - $583 37,000 - - - - -
-
kWh
-
-
MMBtu
$583
37,000
lb
-
-
$
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$279
Cost:
-
- - - - $279 - - - - - -
-
kWh
-
-
MMBtu
$279
-
lb
-
-
$
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$37,448
Cost:
$1,200
- - - - $37,448 629,748 - - - - -
-
kWh
-
-
MMBtu
$37,448
629,748
lb
-
-
$
-
-
$
09: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$9,060
Cost:
$6,710
- - - - - - - - $9,060 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
$9,060
-
$
TOTAL RECOMMENDED Savings:
$70,017
Cost:
$90,006
$10,006 100,235 $2,333 619 $38,310 666,748 $10,308 - $9,060 - $10,006
100,235
kWh
$2,333
619
MMBtu
$38,310
666,748
lb
$10,308
-
$
$9,060
-
$
TOTAL IMPLEMENTED Savings:
$60,163
Cost:
$49,910
$735 7,034 $2,333 619 $37,727 629,748 $10,308 - $9,060 - $735
7,034
kWh
$2,333
619
MMBtu
$37,727
629,748
lb
$10,308
-
$
$9,060
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product