IAC Assessment: UM0085
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0085
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Steering Components
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 144
Plant Area (Sq.Ft.) 75,251
Annual Production 500,000 Pieces
Production Hrs. Annual 4,040
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,807 1,446,366 kWh $0.03
Electricity Demand $71,561 4,248 kW-months/year $16.85
Electricity Fees $1,333 - $ -
Natural Gas $71,099 7,110 MMBtu $10.00
TOTAL ENERGY COSTS $196,964
RECOMMENDED SAVINGS* $138,617 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$570
Cost:
$907
$243 8,206 $327 23 - - - - - - $243
8,206
kWh
$327
23
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,163
Cost:
$5,109
$735 24,912 $1,428 100 - - - - - - $735
24,912
kWh
$1,428
100
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,967
Cost:
$600
$1,265 42,790 $1,702 119 - - - - - - $1,265
42,790
kWh
$1,702
119
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,420
Cost:
$4,000
- - - - $1,420 306 - - - - -
-
kWh
-
-
kW-months/year
$1,420
306
MMBtu
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$10,164
Cost:
-
- - - - - - $10,164 113,269 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,164
113,269
lb
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$108,607
Cost:
-
- - - - - - $108,607 1,820,459 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$108,607
1,820,459
lb
-
-
$
07: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$12,726
Cost:
-
- - - - - - - - $12,726 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$12,726
-
$
TOTAL RECOMMENDED Savings:
$138,617
Cost:
$10,616
$2,243 75,908 $3,457 242 $1,420 306 $118,771 1,933,728 $12,726 - $2,243
75,908
kWh
$3,457
242
kW-months/year
$1,420
306
MMBtu
$118,771
1,933,728
lb
$12,726
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes