IAC logo
IAC Assessment: UM0086
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0086
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Printed forms and envelopes
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 51,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,030 2,315,065 kWh $0.06
Electricity Demand $55,210 5,867 kW-months/year $9.41
Electricity Fees $8,662 - $ -
Natural Gas $12,822 3,000 MMBtu $4.27
TOTAL ENERGY COSTS $222,719
RECOMMENDED SAVINGS* $60,184 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,588
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,640
Cost:
$7,640
$5,698 118,113 $1,942 136 - - - - - - - - $5,698
118,113
kWh
$1,942
136
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,988
Cost:
$23,988
$19,329 196,366 $4,659 327 - - - - - - - - $19,329
196,366
kWh
$4,659
327
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$600
Cost:
$600
$521 3,224 $79 6 - - - - - - - - $521
3,224
kWh
$79
6
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
04: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$1,270
Cost:
$5,080
- - - - $718 660 $(-472) - $1,024 - - - -
-
kWh
-
-
kW-months/year
$718
660
gal
$(-472)
-
$
$1,024
-
$
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$26,686
Cost:
$1,500
- - - - - - - - - - $26,686 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
$26,686
-
$
TOTAL RECOMMENDED Savings:
$60,184
Cost:
$38,808
$25,548 317,703 $6,680 469 $718 660 $(-472) - $1,024 - $26,686 - $25,548
317,703
kWh
$6,680
469
kW-months/year
$718
660
gal
$(-472)
-
$
$1,024
-
$
$26,686
-
$
TOTAL IMPLEMENTED Savings:
$24,588
Cost:
$24,588
$19,850 199,590 $4,738 333 - - - - - - - - $19,850
199,590
kWh
$4,738
333
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material Primary Product