IAC Assessment: UM0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Steel Stamped Items
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 65,000
Annual Production 307,000,000 Pieces
Production Hrs. Annual 2,250
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,998 1,283,705 kWh $0.03
Electricity Demand $84,811 4,956 kW-months/year $17.11
Electricity Fees $1,441 - $ -
Natural Gas $14,518 3,652 MMBtu $3.98
TOTAL ENERGY COSTS $143,226
RECOMMENDED SAVINGS* $29,153 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,197
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,096
Cost:
$1,755
$493 16,706 $603 42 - - - - - - - - $493
16,706
kWh
$603
42
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,710
Cost:
$4,546
$569 19,343 $1,141 80 - - - - - - - - $569
19,343
kWh
$1,141
80
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$113
Cost:
$200
$113 3,810 - - - - - - - - - - $113
3,810
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,141
Cost:
$2,000
- - - - $1,141 415 - - - - - - -
-
kWh
-
-
kW-months/year
$1,141
415
MMBtu
-
-
lb
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,250
Cost:
-
- - - - - - $5,250 101,130 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,250
101,130
lb
-
-
$
-
-
$
06: 4.6210 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$19,843
Cost:
$14,648
- - - - - - - - $14,063 - $5,780 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$14,063
-
$
$5,780
-
$
TOTAL RECOMMENDED Savings:
$29,153
Cost:
$23,149
$1,175 39,859 $1,744 122 $1,141 415 $5,250 101,130 $14,063 - $5,780 - $1,175
39,859
kWh
$1,744
122
kW-months/year
$1,141
415
MMBtu
$5,250
101,130
lb
$14,063
-
$
$5,780
-
$
TOTAL IMPLEMENTED Savings:
$9,197
Cost:
$8,301
$1,062 36,049 $1,744 122 $1,141 415 $5,250 101,130 - - - - $1,062
36,049
kWh
$1,744
122
kW-months/year
$1,141
415
MMBtu
$5,250
101,130
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material Primary Product