IAC logo
IAC Assessment: UM0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Reels and Mandrels
NAICS n/a
SIC 3547 - Rolling Mill Machinery
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 104,800
Annual Production 216,000 Units
Production Hrs. Annual 6,321
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,553 2,807,737 kWh $0.05
Electricity Demand $87,357 5,064 kW-months/year $17.25
Electricity Fees $51,136 - $ -
Natural Gas $24,370 17,868 MMBtu $1.36
TOTAL ENERGY COSTS $303,927
RECOMMENDED SAVINGS* $16,947 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,107
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,423
Cost:
$1,650
$773 17,585 $650 53 - - - - $773
17,585
kWh
$650
53
kW-months/year
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,152
Cost:
$10,210
$1,699 38,687 $2,453 204 - - - - $1,699
38,687
kWh
$2,453
204
kW-months/year
-
-
Tgal
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$373
Cost:
$600
$252 6,155 $121 10 - - - - $252
6,155
kWh
$121
10
kW-months/year
-
-
Tgal
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$688
Cost:
$400
$688 17,292 - - - - - - $688
17,292
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$3,511
Cost:
$3,500
- - - - $3,511 1,647,360 - - -
-
kWh
-
-
kW-months/year
$3,511
1,647,360
Tgal
-
-
$
06: 4.5110 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$6,800
Cost:
$400
- - - - - - $6,800 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$6,800
-
$
TOTAL RECOMMENDED Savings:
$16,947
Cost:
$16,760
$3,412 79,719 $3,224 267 $3,511 1,647,360 $6,800 - $3,412
79,719
kWh
$3,224
267
kW-months/year
$3,511
1,647,360
Tgal
$6,800
-
$
TOTAL IMPLEMENTED Savings:
$12,107
Cost:
$6,150
$1,025 23,740 $771 63 $3,511 1,647,360 $6,800 - $1,025
23,740
kWh
$771
63
kW-months/year
$3,511
1,647,360
Tgal
$6,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes