IAC Assessment: UM0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product High Pressure Water Jetting Systems
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 40,200
Annual Production 216,000 Units
Production Hrs. Annual 6,552
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,663 1,464,830 kWh $0.10
Electricity Fees $3,146 - $ -
Natural Gas $28,869 7,141 MMBtu $4.04
TOTAL ENERGY COSTS $278,028
RECOMMENDED SAVINGS* $40,264 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,786
#|Description Savings
Cost
Status Electricity Usage Other Liquid (haz) By-product Production Electricity Usage Other Liquid (haz) By-product Production
$ kWh $ gal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,791
Cost:
$2,165
$1,791 17,878 - - - - $1,791
17,878
kWh
-
-
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,478
Cost:
$9,846
$5,478 54,807 - - - - $5,478
54,807
kWh
-
-
gal
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,896
Cost:
$1,000
$1,896 19,050 - - - - $1,896
19,050
kWh
-
-
gal
-
-
$
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$30,459
Cost:
$1,000
- - $30,459 147 - - -
-
kWh
$30,459
147
gal
-
-
$
05: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$640
Cost:
$4,500
- - - - $640 - -
-
kWh
-
-
gal
$640
-
$
TOTAL RECOMMENDED Savings:
$40,264
Cost:
$18,511
$9,165 91,735 $30,459 147 $640 - $9,165
91,735
kWh
$30,459
147
gal
$640
-
$
TOTAL IMPLEMENTED Savings:
$34,786
Cost:
$8,665
$3,687 36,928 $30,459 147 $640 - $3,687
36,928
kWh
$30,459
147
gal
$640
-
$
Savings
Cost
$ kWh $ gal $ $
Electricity Usage Other Liquid (haz) By-product Production Electricity Usage Other Liquid (haz) By-product Production