IAC logo
IAC Assessment: UM0098
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0098
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Fiberglass reinforced products
NAICS n/a
SIC 3070 -
Sales $1,000,000-$5,000,000
# of Employees 41
Plant Area (Sq.Ft.) 38,000
Annual Production 350 Tons
Production Hrs. Annual 2,470
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,728 518,171 kWh $0.04
Electricity Demand $27,619 2,388 kW-months/year $11.57
Electricity Fees $606 - $ -
Natural Gas $19,064 4,926 MMBtu $3.87
TOTAL ENERGY COSTS $70,017
RECOMMENDED SAVINGS* $30,203 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,525
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$364
Cost:
$5,910
$152 3,517 $212 224 - - $152
3,517
kWh
$212
224
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,225
Cost:
$10,986
$1,327 30,188 $1,898 164 - - $1,327
30,188
kWh
$1,898
164
kW-months/year
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$939
Cost:
$480
$566 5,862 $373 32 - - $566
5,862
kWh
$373
32
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,222
Cost:
$700
$2,222 23,447 - - - - $2,222
23,447
kWh
-
-
kW-months/year
-
-
$
05: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING Savings:
$23,453
Cost:
$15,000
- - - - $23,453 - -
-
kWh
-
-
kW-months/year
$23,453
-
$
TOTAL RECOMMENDED Savings:
$30,203
Cost:
$33,076
$4,267 63,014 $2,483 420 $23,453 - $4,267
63,014
kWh
$2,483
420
kW-months/year
$23,453
-
$
TOTAL IMPLEMENTED Savings:
$3,525
Cost:
$7,090
$2,940 32,826 $585 256 - - $2,940
32,826
kWh
$585
256
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $