IAC logo
IAC Assessment: UM0109
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0109
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1998
Principal Product Prototype Automotive Parts
NAICS n/a
SIC 3711 - Motor Vehicles And Car Bodies
Sales $5,000,000-$10,000,000
# of Employees 58
Plant Area (Sq.Ft.) 37,000
Annual Production 100 Units
Production Hrs. Annual 3,718
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,654 618,992 kWh $0.10
Electricity Fees $1,583 - $ -
Natural Gas $13,690 3,280 MMBtu $4.17
TOTAL ENERGY COSTS $76,482
RECOMMENDED SAVINGS* $47,452 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,618
#|Description Savings
Cost
Status Electricity Usage Water Disposal Personnel Changes Electricity Usage Water Disposal Personnel Changes
$ kWh $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$168
Cost:
$208
$168 1,758 - - - - $168
1,758
kWh
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$924
Cost:
$2,743
$924 9,379 - - - - $924
9,379
kWh
-
-
Tgal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$851
Cost:
$400
$851 8,792 - - - - $851
8,792
kWh
-
-
Tgal
-
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$504
Cost:
$2,100
$504 6,448 - - - - $504
6,448
kWh
-
-
Tgal
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$555
Cost:
$1,200
- - $555 222,000 - - -
-
kWh
$555
222,000
Tgal
-
-
$
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$44,450
Cost:
$100
- - - - $44,450 - -
-
kWh
-
-
Tgal
$44,450
-
$
TOTAL RECOMMENDED Savings:
$47,452
Cost:
$6,751
$2,447 26,377 $555 222,000 $44,450 - $2,447
26,377
kWh
$555
222,000
Tgal
$44,450
-
$
TOTAL IMPLEMENTED Savings:
$44,618
Cost:
$308
$168 1,758 - - $44,450 - $168
1,758
kWh
-
-
Tgal
$44,450
-
$
Savings
Cost
$ kWh $ Tgal $ $
Electricity Usage Water Disposal Personnel Changes Electricity Usage Water Disposal Personnel Changes