Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1998 |
Principal Product | Food Procesing Equipment |
NAICS | n/a |
SIC | 3550 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 122 |
Plant Area (Sq.Ft.) | 45,935 |
Annual Production | 200,000 Pieces |
Production Hrs. Annual | 6,732 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $79,143 | 2,533,705 | kWh | $0.03 |
Electricity Demand | $99,616 | 5,472 | kW-months/year | $18.20 |
Electricity Fees | $3,329 | - | $ | - |
Natural Gas | $18,229 | 2,967 | MMBtu | $6.14 |
TOTAL ENERGY COSTS | $207,337 | |||
RECOMMENDED SAVINGS* | $56,993 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,723 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,418 Cost: $2,142 |
$2,356 | 32,825 | $1,062 | 58 | - | - | - | - | - | - |
$2,356 32,825 kWh |
$1,062 58 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $20,663 Cost: $25,773 |
$11,709 | 161,782 | $8,954 | 492 | - | - | - | - | - | - |
$11,709 161,782 kWh |
$8,954 492 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $436 Cost: $650 |
- | - | - | - | $436 | 104 | - | - | - | - |
- - kWh |
- - kW-months/year |
$436 104 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $3,162 Cost: $960 |
- | - | - | - | $3,162 | 764 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,162 764 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $7,020 Cost: $16,000 |
- | - | - | - | - | - | $7,020 | 86,400 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,020 86,400 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $3,814 Cost: $11,000 |
- | - | - | - | - | - | $3,814 | 13,260 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,814 13,260 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,000 Cost: $1,554 |
- | - | - | - | - | - | - | - | $15,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$15,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE |
Savings: $3,480 Cost: $3,342 |
- | - | - | - | - | - | - | - | $3,480 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$3,480 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,993 Cost: $61,421 |
$14,065 | 194,607 | $10,016 | 550 | $3,598 | 868 | $10,834 | 99,660 | $18,480 | - | $14,065 194,607 kWh |
$10,016 550 kW-months/year |
$3,598 868 MMBtu |
$10,834 99,660 Tgal |
$18,480 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,723 Cost: $33,771 |
$14,065 | 194,607 | $10,016 | 550 | $3,162 | 764 | - | - | $18,480 | - | $14,065 194,607 kWh |
$10,016 550 kW-months/year |
$3,162 764 MMBtu |
- - Tgal |
$18,480 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes |