IAC logo
IAC Assessment: UM0113
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0113
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1998
Principal Product Food Procesing Equipment
NAICS n/a
SIC 3550 -
Sales $10,000,000-$50,000,000
# of Employees 122
Plant Area (Sq.Ft.) 45,935
Annual Production 200,000 Pieces
Production Hrs. Annual 6,732
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,143 2,533,705 kWh $0.03
Electricity Demand $99,616 5,472 kW-months/year $18.20
Electricity Fees $3,329 - $ -
Natural Gas $18,229 2,967 MMBtu $6.14
TOTAL ENERGY COSTS $207,337
RECOMMENDED SAVINGS* $56,993 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,723
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,418
Cost:
$2,142
$2,356 32,825 $1,062 58 - - - - - - $2,356
32,825
kWh
$1,062
58
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,663
Cost:
$25,773
$11,709 161,782 $8,954 492 - - - - - - $11,709
161,782
kWh
$8,954
492
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$436
Cost:
$650
- - - - $436 104 - - - - -
-
kWh
-
-
kW-months/year
$436
104
MMBtu
-
-
Tgal
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,162
Cost:
$960
- - - - $3,162 764 - - - - -
-
kWh
-
-
kW-months/year
$3,162
764
MMBtu
-
-
Tgal
-
-
$
05: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$7,020
Cost:
$16,000
- - - - - - $7,020 86,400 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,020
86,400
Tgal
-
-
$
06: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$3,814
Cost:
$11,000
- - - - - - $3,814 13,260 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,814
13,260
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,000
Cost:
$1,554
- - - - - - - - $15,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$15,000
-
$
08: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$3,480
Cost:
$3,342
- - - - - - - - $3,480 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$3,480
-
$
TOTAL RECOMMENDED Savings:
$56,993
Cost:
$61,421
$14,065 194,607 $10,016 550 $3,598 868 $10,834 99,660 $18,480 - $14,065
194,607
kWh
$10,016
550
kW-months/year
$3,598
868
MMBtu
$10,834
99,660
Tgal
$18,480
-
$
TOTAL IMPLEMENTED Savings:
$45,723
Cost:
$33,771
$14,065 194,607 $10,016 550 $3,162 764 - - $18,480 - $14,065
194,607
kWh
$10,016
550
kW-months/year
$3,162
764
MMBtu
-
-
Tgal
$18,480
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes