IAC logo
IAC Assessment: UM0117
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1998
Principal Product Shipping Containers Components
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 61
Plant Area (Sq.Ft.) 74,000
Annual Production 29 Tons
Production Hrs. Annual 5,200
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,555 1,720,985 kWh $0.04
Electricity Demand $37,215 4,356 kW-months/year $8.54
Electricity Fees $11,233 - $ -
Natural Gas $28,903 7,202 MMBtu $4.01
TOTAL ENERGY COSTS $167,306
RECOMMENDED SAVINGS* $35,951 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,551
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$558
Cost:
$918
$259 9,086 $299 21 - - - - - - $259
9,086
kWh
$299
21
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,896
Cost:
$9,124
$1,345 45,721 $2,551 179 - - - - - - $1,345
45,721
kWh
$2,551
179
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$724
Cost:
$1,000
$225 7,620 $499 35 - - - - - - $225
7,620
kWh
$499
35
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,314
Cost:
$658
- - - - $3,314 852 - - - - -
-
kWh
-
-
kW-months/year
$3,314
852
MMBtu
-
-
gal
-
-
lb
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$14,400
Cost:
$1,000
- - - - - - $14,400 660 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,400
660
gal
-
-
lb
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$2,059
Cost:
$250
- - - - - - - - $2,059 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,059
-
lb
07: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$11,000
Cost:
$11,000
- - - - - - - - $11,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$11,000
-
lb
TOTAL RECOMMENDED Savings:
$35,951
Cost:
$23,950
$1,829 62,427 $3,349 235 $3,314 852 $14,400 660 $13,059 - $1,829
62,427
kWh
$3,349
235
kW-months/year
$3,314
852
MMBtu
$14,400
660
gal
$13,059
-
lb
TOTAL IMPLEMENTED Savings:
$10,551
Cost:
$11,950
$1,829 62,427 $3,349 235 $3,314 852 - - $2,059 - $1,829
62,427
kWh
$3,349
235
kW-months/year
$3,314
852
MMBtu
-
-
gal
$2,059
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)