Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1998 |
Principal Product | Shipping Containers Components |
NAICS | n/a |
SIC | 3441 - Fabricated Structural Metal |
Sales | $10,000,000-$50,000,000 |
# of Employees | 61 |
Plant Area (Sq.Ft.) | 74,000 |
Annual Production | 29 Tons |
Production Hrs. Annual | 5,200 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $75,555 | 1,720,985 | kWh | $0.04 |
Electricity Demand | $37,215 | 4,356 | kW-months/year | $8.54 |
Electricity Fees | $11,233 | - | $ | - |
Natural Gas | $28,903 | 7,202 | MMBtu | $4.01 |
TOTAL ENERGY COSTS | $167,306 | |||
RECOMMENDED SAVINGS* | $35,951 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,551 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $558 Cost: $918 |
$259 | 9,086 | $299 | 21 | - | - | - | - | - | - |
$259 9,086 kWh |
$299 21 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,896 Cost: $9,124 |
$1,345 | 45,721 | $2,551 | 179 | - | - | - | - | - | - |
$1,345 45,721 kWh |
$2,551 179 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $724 Cost: $1,000 |
$225 | 7,620 | $499 | 35 | - | - | - | - | - | - |
$225 7,620 kWh |
$499 35 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,314 Cost: $658 |
- | - | - | - | $3,314 | 852 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,314 852 MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $14,400 Cost: $1,000 |
- | - | - | - | - | - | $14,400 | 660 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$14,400 660 gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $2,059 Cost: $250 |
- | - | - | - | - | - | - | - | $2,059 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$2,059 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $11,000 Cost: $11,000 |
- | - | - | - | - | - | - | - | $11,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$11,000 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,951 Cost: $23,950 |
$1,829 | 62,427 | $3,349 | 235 | $3,314 | 852 | $14,400 | 660 | $13,059 | - | $1,829 62,427 kWh |
$3,349 235 kW-months/year |
$3,314 852 MMBtu |
$14,400 660 gal |
$13,059 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,551 Cost: $11,950 |
$1,829 | 62,427 | $3,349 | 235 | $3,314 | 852 | - | - | $2,059 | - | $1,829 62,427 kWh |
$3,349 235 kW-months/year |
$3,314 852 MMBtu |
- - gal |
$2,059 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) |