Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1998 |
Principal Product | Stamped Metal Parts |
NAICS | n/a |
SIC | 3465 - Automotive Stampings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 618,496 |
Annual Production | 1,100,000 Pieces |
Production Hrs. Annual | 6,912 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $530,969 | 15,705,745 | kWh | $0.03 |
Electricity Demand | $261,590 | 31,716 | kW-months/year | $8.25 |
Electricity Fees | $43,332 | - | $ | - |
Natural Gas | $384,842 | 124,143 | MMBtu | $3.10 |
TOTAL ENERGY COSTS | $1,223,640 | |||
RECOMMENDED SAVINGS* | $382,118 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,067 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $5,067 Cost: $11,283 |
$3,930 | 74,150 | $1,137 | 148 | - | - | - | - | - | - | - | - |
$3,930 74,150 kWh |
$1,137 148 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,659 Cost: $30,946 |
$7,710 | 201,055 | $2,949 | 384 | - | - | - | - | - | - | - | - |
$7,710 201,055 kWh |
$2,949 384 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $19,816 Cost: $1,800 |
$15,838 | 298,359 | $3,978 | 518 | - | - | - | - | - | - | - | - |
$15,838 298,359 kWh |
$3,978 518 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $24,125 Cost: $3,800 |
- | - | - | - | $24,125 | 8,468 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$24,125 8,468 MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT |
Savings: $200 Cost: $132 |
- | - | - | - | - | - | $200 | 12,253 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$200 12,253 Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $2,707 Cost: $11,000 |
- | - | - | - | - | - | - | - | $2,707 | 16,200 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,707 16,200 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE |
Savings: $319,544 Cost: - |
- | - | - | - | - | - | - | - | - | - | $319,544 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$319,544 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $382,118 Cost: $58,961 |
$27,478 | 573,564 | $8,064 | 1,050 | $24,125 | 8,468 | $200 | 12,253 | $2,707 | 16,200 | $319,544 | - | $27,478 573,564 kWh |
$8,064 1,050 kW-months/year |
$24,125 8,468 MMBtu |
$200 12,253 Tgal |
$2,707 16,200 gal |
$319,544 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,067 Cost: $11,283 |
$3,930 | 74,150 | $1,137 | 148 | - | - | - | - | - | - | - | - | $3,930 74,150 kWh |
$1,137 148 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes |