IAC logo
IAC Assessment: UM0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1999
Principal Product Plating Chemicals
NAICS n/a
SIC 2899 - Chemical Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 257,000
Annual Production 17,100,000 Pounds
Production Hrs. Annual 2,340
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $176,640 5,900,645 kWh $0.03
Electricity Demand $216,623 20,148 kW-months/year $10.75
Electricity Fees $11,674 - $ -
Natural Gas $116,368 43,408 MMBtu $2.68
TOTAL ENERGY COSTS $521,305
RECOMMENDED SAVINGS* $101,668 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,173
Cost:
$10,972
$4,199 142,145 $10,974 744 - - - - - - $4,199
142,145
kWh
$10,974
744
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$616
Cost:
$1,400
$616 20,809 - - - - - - - - $616
20,809
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,228
Cost:
-
- - - - $2,228 831 - - - - -
-
kWh
-
-
kW-months/year
$2,228
831
MMBtu
-
-
Tgal
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$202
Cost:
$510
- - - - $202 74 - - - - -
-
kWh
-
-
kW-months/year
$202
74
MMBtu
-
-
Tgal
-
-
$
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$2,646
Cost:
$5,280
- - - - $2,646 776 - - - - -
-
kWh
-
-
kW-months/year
$2,646
776
MMBtu
-
-
Tgal
-
-
$
06: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$14,658
Cost:
$6,690
- - - - $6,795 2,602 $7,863 1,570,000 - - -
-
kWh
-
-
kW-months/year
$6,795
2,602
MMBtu
$7,863
1,570,000
Tgal
-
-
$
07: 3.4155 METER WASTE WATER Savings:
$2,154
Cost:
$500
- - - - - - $2,154 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,154
-
Tgal
-
-
$
08: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$63,991
Cost:
$63,991
- - - - - - - - $63,991 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$63,991
-
$
TOTAL RECOMMENDED Savings:
$101,668
Cost:
$89,343
$4,815 162,954 $10,974 744 $11,871 4,283 $10,017 1,570,000 $63,991 - $4,815
162,954
kWh
$10,974
744
kW-months/year
$11,871
4,283
MMBtu
$10,017
1,570,000
Tgal
$63,991
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes