IAC Assessment: UM0205
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2002
Principal Product forestry blades and saws
NAICS n/a
SIC 3490 -
Sales $10,000,000-$50,000,000
# of Employees 69
Plant Area (Sq.Ft.) 92,000
Annual Production 3,120,000 Pounds
Production Hrs. Annual 6,000
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $202,645 5,696,535 kWh $0.04
Electricity Demand $145,988 1,280 kW-months/year $114.05
Electricity Fees $4,974 - $ -
Natural Gas $23,231 4,768 MMBtu $4.87
TOTAL ENERGY COSTS $401,566
RECOMMENDED SAVINGS* $41,135 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,594
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$18,000
Cost:
$5,940
- - - - $18,000 3,040,000 - - -
-
kWh
-
-
kW-months/year
$18,000
3,040,000
Tgal
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$11,300
Cost:
$15,000
- - $11,300 1,200 - - - - -
-
kWh
$11,300
1,200
kW-months/year
-
-
Tgal
-
-
$
03: 2.5123 REDUCE FLUID FLOW RATES Savings:
$4,604
Cost:
$1,600
$3,240 90,000 $1,364 180 - - - - $3,240
90,000
kWh
$1,364
180
kW-months/year
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,937
Cost:
$11,015
$1,965 54,445 $972 130 - - - - $1,965
54,445
kWh
$972
130
kW-months/year
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,362
Cost:
$300
$2,105 65,575 $1,257 168 - - - - $2,105
65,575
kWh
$1,257
168
kW-months/year
-
-
Tgal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$932
Cost:
$1,000
$346 10,776 $209 28 - - $377 - $346
10,776
kWh
$209
28
kW-months/year
-
-
Tgal
$377
-
$
TOTAL RECOMMENDED Savings:
$41,135
Cost:
$34,855
$7,656 220,796 $15,102 1,706 $18,000 3,040,000 $377 - $7,656
220,796
kWh
$15,102
1,706
kW-months/year
$18,000
3,040,000
Tgal
$377
-
$
TOTAL IMPLEMENTED Savings:
$33,594
Cost:
$22,240
$2,451 76,351 $12,766 1,396 $18,000 3,040,000 $377 - $2,451
76,351
kWh
$12,766
1,396
kW-months/year
$18,000
3,040,000
Tgal
$377
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost